Materials |
|
|
Drawings |
- Premium 2D & 3D – Floor Plans
- Luxury 3D Elevation Designs of all views
- Design Development – A maximum of 40 drawing revisions
- Internal Isometric Views all rooms, open areas etc & detailed renders for each segment of the home for better understanding of the design
- Detailed Landscaping design
- 3D Walkthrough of the home along with internal & external walkthrough
- Hands on isometric 3D model of the home with separate floors
- Site survey by surveyor with instruments & drawing on the basis of survey
|
- Premium 2D & 3D – Floor Plans
- Luxury 3D Elevation Designs of all views
- Design Development – A maximum of 40 drawing revisions
- Internal Isometric Views all rooms, open areas etc & detailed renders for each segment of the home for better understanding of the design
- Detailed Landscaping design
- 3D Walkthrough of the home along with internal & external walkthrough
- Hands on isometric 3D model of the home with separate floors
- Site survey by surveyor with instruments & drawing on the basis of survey
|
Civil Construction |
- Floor to floor height – 11'
- Steel (500 TMT bars) – JSW/SAIL/Vizag
- Cement (Grade 53 or 43 as per requirement) – Ultratech/ACC
- UG Sump built with solid blocks of 8" thickness & waterproof plastered 10000lts
- Concrete – M25 grade
- Internal courtyards, skylights other designer architectural elements are included
- Internal, external and toilet wall – column joints plastering with chicken mesh
- Waterproofing compound – Dr.Fixit/FOSROC for external walls
- Crystalline waterproofing, Cinder filling in sunken toilets, Heat & Waterproofing in Terrace
- Steel/concrete lofts – Not Included
- Ledge wall for incorporating concealed sanitary parts is included
- Anti Termite treatment
|
- Floor to floor height – 11'
- Steel (500 TMT bars) – JSW/SAIL/Vizag
- Cement (Grade 53 or 43 as per requirement) – Ultratech/ACC
- UG Sump built with solid blocks of 8" thickness & waterproof plastered 10000lts
- Concrete – M25 grade
- Internal courtyards, skylights other designer architectural elements are included
- Internal, external and toilet wall – column joints plastering with chicken mesh
- Waterproofing compound – Dr.Fixit/FOSROC for external walls
- Crystalline waterproofing, Cinder filling in sunken toilets, Heat & Waterproofing in Terrace
- Steel/concrete lofts – Not Included
- Ledge wall for incorporating concealed sanitary parts is included
- Anti Termite treatment
|
Architecture Diagrams |
- Working drawing for all works
- Schedule of Openings
- Section and Elevation
- Detailed portfolio of the home post-handover
|
- Working drawing for all works
- Schedule of Openings
- Section and Elevation
- Detailed portfolio of the home post-handover
|
Structural Design |
- Structural Design as per IS Code.
- Good for construction drawings
- Soil Test report
- Overlapped Structural, Architectural & MEP Drawings
- 3D structural drawings & Design Analysis Report
|
- Structural Design as per IS Code.
- Good for construction drawings
- Soil Test report
- Overlapped Structural, Architectural & MEP Drawings
- 3D structural drawings & Design Analysis Report
|
MEP |
- Electrical Layout
- Plumbing Water Line Layout
- Plumbing Drainage Line Layout
|
- Electrical Layout
- Plumbing Water Line Layout
- Plumbing Drainage Line Layout
|
Govt. Permissions |
- We will provide liaison assistance with different government agencies, obtain permissions, licenses & sanction fee for the following (if applicable).
- Construction Plan Sanction
- Temporary Electricity connection
- Permanent electrical connection
- Water connection
- Sewage connection
|
- We will provide liaison assistance with different government agencies, obtain permissions, licenses & sanction fee for the following (if applicable).
- Construction Plan Sanction
- Temporary Electricity connection
- Permanent electrical connection
- Water connection
- Sewage connection
|
Windows |
- UPVC windows – 5mm clear glass with MS Grills
- Basic price: uPVC with MS grill – Rs.550/- per Sqft (If required, upgrade to wooden windows can be made at an additional cost per Sqft, measured on built-up area. The additional cost can be calculated based on the wooden material chosen by the Client.)
|
- UPVC windows of Fenesta or equivalent make – 5mm clear glass with MS Grills
- Basic price: uPVC with MS grill or wooden including hardware – Rs.750/- per Sqft OR Wooden windows – Sal wood Frame (5"x3") & Honne Shutter (1.5" thickness) with clear glass and grill rods
|
Fabrication |
- Main Gate: Designer Gate with Shera boards – Rs. 350/- per Sqft
- External staircase & balcony railing: MS Railing – Rs. 600/- per Sqft
- Internal staircase railing: SS Railing – Rs.1080/- per Sqft
- Utility grill is not included in the package
- Waterproofing is included for Utility & balcony portions
|
- Main Gate: Designer Gate with Shera boards – Rs. 350/- per Sqft
- External staircase & balcony railing: MS Railing – Rs. 600/- per Sqft
- Internal staircase railing: SS Railing – Rs.1080/- per Sqft
- Utility grill is not included in the package
- Waterproofing is included for Utility & balcony portions
|
Compound Wall |
- Compound wall – Solid block walls of 4" thickness to suit the elevation (If charged)
- Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
- Height of Compound wall – 5 Feet
- Compound wall – Plastered & Painted
|
- Compound wall – Solid block walls of 4" thickness to suit the elevation (If charged)
- Excavation, Foundation, PCC, Size Stone Masonry with DPC course above SSM
- Height of Compound wall – 5 Feet
- Compound wall – Plastered & Painted
|
Elevation |
- This proposal includes a luxurious elevation
- A 3D elevation is presented for client to choose from & design further
|
- This proposal includes a luxurious elevation
- A 3D elevation is presented for client to choose from & design further
|
Exclusions and Inclusions |
- A design if needed to be modified more than thrice shall be charged for accordingly
- Government fees for the liaison bodies to be paid directly by the client
- The complete fee payment for plan sanction in Panchayat limits need to be borne by client
- Hard rock/soft rock excavation, if it arises shall be charged for accordingly
- Percentage of opening for doors & windows – 20% of built up area Maximum
- One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
- If there are constraints in material delivery or stocking place and materials to be ordered in small quantities, the additional charges for the same shall be charged on actuals
- A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
- Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
- NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.
|
- A design if needed to be modified more than thrice shall be charged for accordingly
- Government fees for the liaison bodies to be paid directly by the client
- The complete fee payment for plan sanction in Panchayat limits need to be borne by client
- Hard rock/soft rock excavation, if it arises shall be charged for accordingly
- Percentage of opening for doors & windows – 20% of built up area Maximum
- One point of Electricity & water needs to be provided by the client free of cost to facilitate construction
- If there are constraints in material delivery or stocking place and materials to be ordered in small quantities, the additional charges for the same shall be charged on actuals
- A specific area to construct labour and material shed needs to be provided within 50 feet from the construction place by the client
- Any road cutting charges for the connection of Electricity and Sewage lines is not included, such works shall be charged additionally
- NOTE: The above mentioned material specifications are generalized, the inclusion or the exclusion of the same shall vary depending on the floor plan.
|
Payments |
- A customized Stage wise payment schedule will be shared based on the project specifications.
- Client needs to pay the stage payments before stage work starts.
|
- A customized payment schedule will be shared based on the project specifications.
|
Guarantee and Warranty |
- Construction guarantee – 5 Year;
- Waterproofing warranty – 10 Years;
- Guarantee & warranty is provided on Stamp paper
|
- Construction guarantee – 5 Year;
- Waterproofing warranty – 10 Years;
- Guarantee & warranty is provided on Stamp paper
|
Turn Key |
- Convert this to TurnKey at just Rs-800/Sqft
- Kitchen is given with acrylic sheet on Boiling Water Plywood. The basic price of acrylic sheet is ₹4000/- per sheet
- Wardrobes are made with Century ply & 4mm thick veneer sheet finished with hand polish.
- Basic price of veneer sheet is ₹2,500/ sheet
- All other interior elements are given with century plywood and laminate. The basic price of laminate is ₹1550/-
- One wardrobe for every 1000 sqft of slab laid area of dimension 7' x 10' including loft
- One modular kitchen up to 150 sqft with ₹50,000/- worth accessories, made of BWP century ply with acrylic sheet
- TV unit of 40 sqft with storage
- Shoe rack of 15 sqft with bottom and tall units
- Crockery unit of dimension 3'6" x 7' with glass shutters
- False ceiling up to 12' x 12' (including peripheral false ceiling)
- Foyer unit is provided with basic storage up to 15 sqft
- Dressing table in master bedrooms is provided with mirror and 2' vanity at the bottom.
- Decorative wall ledges up to 20 rft
- Wall paper up to 200 sqft will be provided
- Wall partition with veneer will be provided wherever needed up to 50 Sqft
- Storage in Puja up to 15 sqft
- Headboard tufting at master bedroom shall be provided up to 33 Sqft
- Study table up to 30 sqft will be provided
- One vanity in every toilet
- These specifications and measurements are included in the package. However, this doesn't limit to executing beyond these measurements & specifications on added actual costs
- Electrical points for false ceiling are included in the package. All other points wherever needed additionally shall be charged on actuals
|
- Convert this to TurnKey at just Rs-800/Sqft
- Kitchen is given with acrylic sheet on Boiling Water Plywood. The basic price of acrylic sheet is ₹4000/- per sheet
- Wardrobes are made with Century ply & 4mm thick veneer sheet finished with hand polish.
- Basic price of veneer sheet is ₹2,500/ sheet
- All other interior elements are given with century plywood and laminate. The basic price of laminate is ₹1550/-
- One wardrobe for every 1000 sqft of slab laid area of dimension 7' x 10' including loft
- One modular kitchen up to 150 sqft with ₹50,000/- worth accessories, made of BWP century ply with acrylic sheet
- TV unit of 40 sqft with storage
- Shoe rack of 15 sqft with bottom and tall units
- Crockery unit of dimension 3'6" x 7' with glass shutters
- False ceiling up to 12' x 12' (including peripheral false ceiling)
- Foyer unit is provided with basic storage up to 15 sqft
- Dressing table in master bedrooms is provided with mirror and 2' vanity at the bottom.
- Decorative wall ledges up to 20 rft
- Wall paper up to 200 sqft will be provided
- Wall partition with veneer will be provided where ever needed upto 50 Sqft
- Storage in Puja up to 15 sqft
- Headboard tufting at master bedroom shall be provided upto 33 Sqft
- Study table up to 30 sqft will be provided
- One vanity in every toilet
- These specifications and measurements are included in the package. However, this doesn't limit to executing beyond these measurements & specifications on added actual costs
- Electrical points for false ceiling are included in the package. All other points wherever needed additionally shall be charged on actuals
|